Projects

Over the last decade, we have been at the forefront of construction and development in the region. Here are a few examples of our contributions.

All our construction bridge projects are provided and furnished with girders and driven piles that are pre-cast and pre-stressed in house. In addition to all the precast concrete construction elements needed for AASHAR United Group projects such as (Metal Stud Crete walls, box culverts, and other elements).

Projects

  • Deliver and install 40 concrete pre-stressed pre-cast girders 25 m length and 1.2 m height to North Samawa Bridge - Barbooti Bridge.
  • Deliver and install 40 concrete pre-stressed pre-cast girders 25 m length and 1.2 m height to Samawa North Bridge.
  • Deliver and install 64 concrete pre-stressed pre-cast girders 24 m length and 1.2 m height to Hilal Bridge.
  • Deliver and install 64 concrete pre-stressed pre-cast girders 24 m length and 1.2 m height to Mahdi Bridge.
  • Deliver and install 480 concrete pre-cast piles 30 * 30 cm, 12m depth for Al Rumaytha Overpass.
  • Deliver and install 82 concrete pre-cast piles 30 * 30 cm, 12m depth for Al Rumaytha North Bridge.
  • Deliver and install 82 concrete pre-cast piles 30 * 30 cm, 12m depth for Al Rumaytha South Bridge.
  • Deliver and install 265 concrete pre-cast piles 30 * 30 cm, 12m depth for Abi Qarak Power Station - Hillah.
  • Deliver and install 180 concrete pre-cast piles 30 * 30 cm, 12m depth for Al Khidhir Stadium (2000 persons capacity).
  • Deliver and install 2200 concrete pre-cast piles 30 * 30 cm, 18m depth for Al-Nasir Water Project - Nassiriyah