Over the last decade, we have been at the forefront of construction and development in the region. Here are a few examples of our contributions.

AASHAR United staff has decades of experience in the design, evaluation, and construction of water resources facilities. 

Hilal Water Project

Replace old submersible pumps (100m3/hr) with new ones (200m3/hr), building warehouses to restore chemicals, and building all the required treatment tanks. This project will present potable water for Hilal Province residents and contribute to the elimination of the scarcity of drinking water.

Al Jlail Water Project

One set complete unit of 200 m³/hr water treatment compact unit to be produced and delivered to Al Muthanna Warehouses according to the specification including all civil, mechanical, and electrical works such as (fencing, service building, walkways, roads and pavement, sanitary, etc.)

Jarbouea Ground Reservoirs

Construct two ground reservoirs in Samawa (Stage 2), work includes earthwork, foundation, reinforcement, concrete casting, pre-cast concrete, supply and installation of galvanized ventilation pipes and ductile pipes.

Additional Projects

  • Rumaitha New Ductile: Remove old ductile and install new one (600 mm) in Rumaitha-Samawa-first stage.
  • Various Water Treatment Plants Projects